City of Lake Forest – Bake Pkwy Resurfacing Project

LF Lofo

CITY OF LAKE FOREST

Resurfacing Project for Bake Parkway - Portola Parkway to Lake Forest Drive

The city of Lake Forest is requesting proposals for Project number and name.

Project Estimate: $400,000 to 440,000

Bid Due Date:   June 10, 2014 at 2:00 p.m.

LFMapProject Duration: 40 working days

Project description:

This project will construct a 2-inch rubberized asphalt overlay on Bake Parkway between Portola Parkway and Lake Forest Drive. The project  will construct  a 2-inch rubberized  asphalt overlay utilizing approx. 2 ,000 tons of asphalt (from recycled vehicle tires), removal and replace damaged sidewalks, curbs and gutters,  and ADA Access Ramps as well as removal and repair of sections of the asphalt pavement, raising utility services to grade, re-installation of traffic signal loops, and striping.

 

Plans and Spec are available to purchase at
SABP Reprographics
2372 Morse Avenue, Irvine CA 92614
949 756-1001

workorder@sabp.com